Design project management involves sophisticated task planning that needs to streamline a number of design activities while properly allocating resources associated with these activities. In the field of product family design, there is a lack of comprehensive modeling and analysis formalisms for design project management. In this respect, this paper proposes a modular design project approach to support design project modeling and planning for product families. Design activities are identified as project modules according to the activity sequences, along with the players and resources involved in each activity. A generic variety structure is introduced to characterize the differentiation of design activities among various project variants of the family. Based on the identified modules of activities, design project planning is formulated as a project reconfiguration problem, for which genetic algorithms are employed for configuration evaluation. A case study of truck cab family design in an automobile company demonstrates that design project modularization enhances the coordination of multiple design projects of product families and contributes to the achievement of economy of scale through reusing proven elements.

1.
Meyer
,
M.
, and
Utterback
,
J.
, 1993, “
The Product Family and the Dynamics of Core Capability
,”
Sloan Manage. Rev.
0019-848X,
34
(
3
), pp.
29
47
.
2.
Sundgren
,
N.
, 1999, “
Introducing Interface Management in Product Family Development
,”
J. Prod. Innovation Manage.
0737-6782,
16
(
1
), pp.
40
51
.
3.
Xu
,
Q.
, and
Jiao
,
J.
, 2009, “
Modeling the Design Process for Product Variants With Timed Colored Petri Nets
,”
ASME J. Mech. Des.
0161-8458,
131
(
6
), p.
061009
.
4.
Yassine
,
A.
,
Flakenburg
,
D.
, and
Chelst
,
K.
, 1999, “
Engineering Design Management: An Information Structure Approach
,”
Int. J. Prod. Res.
0020-7543,
37
(
13
), pp.
2957
2975
.
5.
Kusiak
,
A.
,
Larson
,
T. N.
, and
Wang
,
J.
, 1994, “
Reengineering of Design and Manufacturing Processes
,”
Comput. Ind. Eng.
0360-8352,
26
(
3
), pp.
521
536
.
6.
Kang
,
C. M.
, and
Hong
,
Y. S.
, 2009, “
Evaluation of Acceleration Effect of Dynamic Sequencing of Design Process in a Multi-Project Environment
,”
ASME J. Mech. Des.
0161-8458,
131
(
3
), p.
021008
.
7.
Meier
,
C.
,
Yassine
,
A. A.
, and
Browning
,
T. R.
, 2007, “
Design Process Sequencing With Competent Genetic Algorithms
,”
ASME J. Mech. Des.
0161-8458,
129
(
6
), pp.
566
585
.
8.
Qiu
,
Y.
,
Ge
,
P.
, and
Yim
,
S. C.
, 2008, “
Risk-Based Resource Allocation for Collaborative System Design in a Distributed Environment
,”
ASME J. Mech. Des.
0161-8458,
130
(
6
), p.
061403
.
9.
Alizon
,
F.
,
Khadke
,
K.
,
Thevenot
,
H. J.
,
Gershenson
,
J. K.
,
Marion
,
T. J.
,
Shooter
,
S. B.
, and
Simpson
,
T. W.
, 2007, “
Frameworks for Product Family Design and Development
,”
Concurr. Eng. Res. Appl.
1063-293X,
15
(
2
), pp.
187
199
.
10.
Chen
,
S. -J.
, and
Li
,
L.
, 2003, “
Decomposition of Interdependent Task Group for Concurrent Engineering
,”
Comput. Ind. Eng.
0360-8352,
44
(
3
), pp.
435
459
.
11.
Yassine
,
A.
, and
Braha
,
D.
, 2003, “
Complex Concurrent Engineering and the Design Structure Matrix Method
,”
Concurr. Eng. Res. Appl.
1063-293X,
11
(
3
), pp.
165
176
.
12.
Baldwin
,
C. Y.
, and
Clark
,
K. B.
, 2000,
Design Rules
, Vol.
1
,
MIT
,
Cambridge, MA
.
13.
Fixson
,
S.
, 2007, “
Modularity and Commonality Research: Past Developments and Future Opportunities
,”
Concurr. Eng. Res. Appl.
1063-293X,
15
(
2
), pp.
85
111
.
14.
Sosa
,
M. E.
,
Eppinger
,
S. D.
, and
Rowles
,
C. M.
, 2003, “
Identifying Modular and Integrative Systems and Their Impact on Design Team Interactions
,”
ASME J. Mech. Des.
0161-8458,
125
(
2
), pp.
240
252
.
15.
Cho
,
S. -H.
, 2001, “
An Integrated Method for Managing Complex Engineering Projects Using the Design Structure Matrix and Advanced Simulation
,” MS thesis, MIT, Cambridge, MA.
16.
Seol
,
H.
,
Kim
,
C.
,
Lee
,
C.
, and
Park
,
Y.
, 2007, “
Design Process Modularization: Concept and Algorithm
,”
Concurr. Eng. Res. Appl.
1063-293X,
15
(
2
), pp.
175
166
.
17.
Tavares
,
L. V.
, 1994, “
A Stochastic Model to Control Project Duration and Expenditure
,”
Eur. J. Oper. Res.
0377-2217,
78
(
2
), pp.
262
266
.
18.
Meredith
,
J. R.
, and
Mantel
,
S. J.
, 2003,
Project Management a Managerial Approach
, 5th ed.,
Wiley
,
New York
.
19.
Jiao
,
J.
, and
Tseng
,
M. M.
, 1999, “
An Information Modeling Framework for Product Families to Support Mass Customization Production
,”
CIRP Ann.
0007-8506,
48
(
1
), pp.
93
98
.
20.
Hegge
,
H. M. H.
, 1992, “
A Generic Bill-of-Material Processor Using Indirect Identification of Products
,”
Prod. Plan. Control
0953-7287,
3
(
3
), pp.
336
342
.
21.
Jiao
,
J.
,
Tseng
,
M. M.
,
Ma
,
Q.
, and
Zou
,
Y.
, 2000, “
Generic Bill of Materials and Operations for High-Variety Production Management
,”
Concurr. Eng. Res. Appl.
1063-293X,
8
(
4
), pp.
297
322
.
22.
Ulrich
,
K.
, and
Eppinger
,
S. D.
, 1995,
Product Design and Development
,
McGraw-Hill
,
New York
.
23.
Sosa
,
M. E.
,
Eppinger
,
S. D.
, and
Rowles
,
C. M.
, 2007, “
A Network Approach to Define Modularity of Components in Complex Products
,”
ASME J. Mech. Des.
0161-8458,
129
(
11
), pp.
1118
1129
.
24.
Hundal
,
M. S.
, 1997,
Systematic Mechanical Designing: A Cost and Management Perspective
,
ASME
,
New York
.
25.
Jiao
,
J.
, and
Zhang
,
Y.
, 2005, “
Product Portfolio Identification Based on Association Rule Mining
,”
Comput.-Aided Des.
0010-4485,
37
(
2
), pp.
149
172
.
26.
Eppinger
,
S. D.
,
Whitney
,
D. E.
,
Smith
,
R. P.
, and
Gebala
,
D. A.
, 1994, “
A Model-Based Method for Organizing Tasks in Product Development
,”
Res. Eng. Des.
0934-9839,
6
(
1
), pp.
1
13
.
27.
Chen
,
S. -J.
, 2005, “
An Integrated Methodological Framework for Project Task Coordination and Team Organization in Concurrent Engineering
,”
Concurr. Eng. Res. Appl.
1063-293X,
13
(
3
), pp.
185
197
.
28.
Steward
,
D. V.
, 1981, “
The Design Structure System: A Method for Managing the Design of Complex System
,”
IEEE Trans. Eng. Manage.
0018-9391,
28
(
3
), pp.
71
74
.
29.
Mittal
,
S.
, and
Frayman
,
F.
, 1989, “
Towards a Generic Model of Configuration Tasks
,”
Proceedings of the 11th International Joint Conference on Artificial Intelligence
, Detroit, MI, Aug. 20–25, pp.
1395
1401
.
30.
Andersson
,
J.
, and
Wallace
,
D.
, 2002, “
Pareto Optimization Using the Struggle Genetic Crowding Algorithm
,”
Eng. Optimiz.
0305-215X,
34
(
6
), pp.
623
644
.
31.
Wiest
,
J.
, and
Levy
,
F.
, 1977,
A Management Guide to PERT/CPM
,
Prentice-Hall
,
Englewood Cliffs, NJ
.
32.
Peterson
,
J. L.
, 1981,
Petri Net Theory and the Modeling of Systems
,
Prentice-Hall
,
Englewood Cliffs, NJ
.
33.
Morelli
,
M. D.
,
Eppinger
,
S. D.
, and
Gulati
,
R. K.
, 1995, “
Predicting Technical Communication in Product Development Organizations
,”
IEEE Trans. Eng. Manage.
0018-9391,
42
(
3
), pp.
215
222
.
34.
Erixon
,
G.
,
von Yxkull
,
A.
, and
Arnström
,
A.
, 1996, “
Modularity—The Basis for Product and Factory Reengineering
,”
CIRP Ann.
0007-8506,
45
(
1
), pp.
1
6
.
You do not currently have access to this content.