The design point performance of combined cycle power plants has been steadily increasing, because of improvements both in the gas turbine technology and in the heat recovery technology, with multiple pressure heat recovery steam generators. The concern remains, however, that combined cycle power plants, like all installations based on gas turbines, have a rapid performance degradation when the load is reduced. In particular, it is well known that the efficiency degradation of a combined cycle is more rapid than that of a classical steam plant. This paper describes a methodology that can be used to evaluate the part-load performances of combined cycle units. Some examples are presented and discussed, covering multiple pressure arrangements, incorporating supplemental firing and possibly reheat. Some emphasis is put on the additional flexibility offered by the use of supplemental firing, in conjunction with schemes comprising more than one gas turbine per steam turbine. The influence of the gas turbine controls, like the use of variable inlet guide vanes in the compressor control, is also discussed.

1.
Dechamps, P. J., and Mathieu, Ph., 1991, “Repowering Options for the Electricity Generation Mix in Belgium,” ASME IGTI-Vol. 6, p. 43.
2.
Dechamps, P. J., and Mathieu, Ph., 1992, “Modelling of a Steam Power Plant Repowering Option: Replacement of the Conventional Boiler With a New HRSG,” ASME IGTI-Vol. 7, p. 331.
3.
Dechamps, P. J., Mathieu, Ph., and Magain, D., 1993, “Advanced Combined Cycle Alternative With Advanced Gas Turbines,” ASME IGTI-Vol. 8, p. 387.
4.
Desideri, U., and Fibbi, A., 1993, “A Simplified Approach of Off-Design Performance Evaluation of Combined Cycle Power Plants With Single Pressure Steam Cycles,” ASME IGTI-Vol. 8, p. 199.
5.
Facchini, B., 1993, “A Simplified Approach to the Off-Design Performance Evaluation of Single Shaft Heavy Duty Gas Turbines,” ASME IGTI-Vol. 8, p. 189.
6.
Gyarmathy, G., 1989, “On Load Control Methods for Combined Cycle Plants,” ASME IGTI-Vol. 4, p. 39.
7.
Gyarmathy, G., and Ortmann, P., 1991, “The Off-Design of Single and Dual Pressure Steam Cycle in CC Plants,” ASME IGTI-Vol. 6, p. 217.
8.
Harmel, L., 1989, “The Combined Cycle—an Economical System for Production of Electricity,” ASME IGTI-Vol. 4, p. 357.
9.
Kehlhofer, R., 1979, “Calcul du comportement a` charge partielle des centrales combine´es a` turbines a` gaz et a` vapeur,” publication BBC CH-T 040 103 F.
10.
Linnemeijer, M. J. J., and Van Buijtenen, J. P., 1988, “Design Possibilities and Performance of Combined Cycle Operation of Converted Steam Power Plants,” ASME Paper No. 88–GT–178.
This content is only available via PDF.
You do not currently have access to this content.