Abstract

There are new challenges for plant operators due to the increased share of renewable energy. Plant operators must maintain high reliability and high profits while plants are being required to be more flexible to compensate for the variable generation addition of these renewables into the grid. Plant operators must deal with the thermal strain and the wear-and-tear of such operations. Various models have been proposed in the literature. However, no work has been reported on the development of a robust prediction model. The aim of this study was to determine which machine learning algorithm gives the best estimation of boiler component remaining useful life using plant operations. The flexible operation for all units was estimated using the Intertek hourly MW analysis and damage modeling software Loads Model. We used several plant features as predictors (such as equipment manufacturer, operating regime, and ramp rates). We tested five different machine learning techniques and found that gradient boost is the best approach to predict the reduction in life span of the plant with over 90% precision.

References

1.
Lund
,
H.
,
2007
, “
Renewable Energy Strategies for Sustainable Development
,”
Energy
,
32
(
6
), pp.
912
919
. 10.1016/j.energy.2006.10.017
2.
Kumar
,
N.
,
Gascon
,
M.
,
Liu
,
M. C.
,
Faham
,
F. G.
, and
Besuner
,
P.
,
2016
, “
Impact of Large-Scale Wind & Solar Integration on Existing Fossil Generation in United States
,”
Proceedings of the 15th Wind Integration Workshop
,
Vienna
,
Nov. 15–17
, pp.
1
5
.
3.
Kumar
,
N.
,
Rogers
,
D.
,
Burnett
,
T. D.
,
Sullivan
,
E.
, and
Gascon
,
M.
, “
Reliability, Availability, Maintainability (RAM) for Wind Turbines
,”
ASME 2017 Power Conference
,
Paper No. POWER-ICOPE2017-3045
, p.
V002T08A003
.
4.
Pepermans
,
G.
,
Driesen
,
J.
,
Haeseldonckx
,
D.
,
Belmans
,
R.
, and
D’haeseleer
,
W.
,
2005
, “
Distributed Generation: Definition, Benefits and Issues
,”
Energy Policy
,
33
(
6
), pp.
787
798
. 10.1016/j.enpol.2003.10.004
5.
Alizadeh
,
M. I.
,
Parsa Moghaddam
,
M.
,
Amjady
,
N.
,
Siano
,
P.
, and
Sheikh-El-Eslami
,
M. K.
,
2016
, “
Flexibility in Future Power Systems with High Renewable Penetration: A Review
,”
Renewable Sustainable Energy Rev.
,
57
, pp.
1186
1193
. 10.1016/j.rser.2015.12.200
6.
Lefton
,
S. A.
, and
Besuner
,
P.
,
2006
, “
The Cost of Cycling Coal Fired Power Plants
,”
Coal Power Magazine
, pdfs.semanticscholar.org.
7.
Perez-Arriaga
,
I. J.
, and
Batlle
,
C.
,
2012
, “
Impacts of Intermittent Renewables on Electricity Generation System Operation
,”
Econ. Energy Environ. Policy
,
1
(
2
), pp.
3
18
. 10.5547/2160-5890.1.2.1
8.
Nguyen
,
H.
,
Fauriat
,
W.
,
Zio
,
E.
, and
Liu
,
J.
,
2018
, “
A Data-Driven Approach for Predicting the Remaining Useful Life of Steam Generators
,”
2018 3rd International Conference on System Reliability and Safety (ICSRS)
,
Barcelona
,
Nov. 24–26
, pp.
255
260
.
9.
Alamaniotis
,
M.
,
Grelle
,
A.
, and
Tsoukalas
,
L. H.
,
2014
, “
Regression to Fuzziness Method for Estimation of Remaining Useful Life in Power Plant Components
,”
Mech. Syst. Signal Process.
,
48
(
1–2
), pp.
188
198
. 10.1016/j.ymssp.2014.02.014
10.
Kumar
,
N.
,
Paterson
,
S.
,
Coleman
,
K.
,
Lee
,
C.
,
Agan
,
D.
, and
Lefton
,
S.
,
2013
, “
Power Plant Cycling Measure—Evaluating Historical Cycling to Model Future Grid Operations
,”
2013 IEEE Power & Energy Society General Meeting
,
Vancouver, BC
,
July 21–25
, pp.
1
5
.
11.
Czichos
,
H.
,
Saito
,
T.
, and
Smith
,
L.
,
2006
,
Springer Handbook of Materials Measurement Methods
,
Springer
,
New York
.
12.
Cane
,
B. J.
,
1983
, “
Estimating the Remanent Creep Life of Power Plant Components
,”
J. High Temp. Technol.
,
1
(
4
), pp.
215
228
. 10.1080/02619180.1983.11753211
13.
Kumar
,
N.
,
Besuner
,
P.
,
Lefton
,
S.
,
Agan
,
D.
, and
Hilleman
,
D.
,
2012
, “
Power Plant Cycling Costs
,”
National Renewable Energy Laboratory
.
NREL/SR-5500-55433
.
You do not currently have access to this content.